From From and to | To | Freight and required truck | Price | | | | | | | FoodFood (Product assembly) Ref, 18t/85m³, RearRear | | 15.04 | | | | | | | Equipment and partsEquipment (100% prepayment) Tilt, 20t/86m³, Side, TopSide, Top | | 14.04 | | | | | | | Building materialsBuilding materials Tilt, 0.6t/3m³, Consolid, By sea, TopTop | | 14.04 | | | | Note: The cargo is ready, the window 🪟 is 3.5x0.2x3.1 in a crate | | | Equipment and partsEquipment Tilt, 20t/86m³, By sea, TopTop | | 14.04 | | | | | | | Building materialsBuilding materials (Panel) Tilt, 15t/86m³, By sea, Have reserve, TopTop | | 18.02 | | | | Note: Please leave tickets or call. We need a price without a ferry. |
|